CLARIFICATIONS related TO inquiry N° PP 2022/442
SUPPLY OF : 01 High Pressure Control Unit

As the deadline is imminent or on November 10,  2022, the following technical questions are clarified (response in green):

1) « Minimum 1 Electric and 2 air

The cumulative output capacity of the pump systems shall be sufficient to charge the main accumulator system from precharge pressure (1000 psi) to 100 % of the system RWP (3000 psi) within 10 minutes.

 Question: Please kindly advise if “ within 15 minutes is acceptable. It is within 15 minutes according to API 16D standard. » NO , within 10 minutes

 2) « BOP control line

The outlet piping are intended to be connected to coflexes BOP control line by the HAMMER UNION 1  » FIG 602, Threaded end

 Question: Please kindly advise the length of control line. Please kindly confirm whether armor is required.«  Not requested